How it works

Four days, and a date with money behind it.

Most bathrooms take three weeks because nobody planned them. Here is what actually happens, from your first phone call to the walkthrough, and what you get if the date is missed.

The three steps

Phone call, assessment, build.

1A phone call, no chargeTell me what’s happening and I’ll tell you roughly which of the four options fits and what it’s likely to cost. Ten minutes. If it sounds like we’re not the right people, I’ll say so on that call rather than book a visit.
2The Home Safety Assessment, $497Ninety minutes at the house. I watch how she actually moves, then measure everything that decides the build, joist direction, drain position, door clear width, supply lines, the alcove at three heights, and asbestos on anything built before 1990.

Within 48 hours you have a written scope, one fixed price and a completion date. The $497 comes off your invoice if you go ahead.
3The buildMaterials land the Friday before. One crew, one bathroom, nobody disappearing to another job. Four working days for a low-step walk-in shower, seven for curbless, eight to ten for a full accessible bathroom.

Ninety minutes measuring the things that actually decide the build.

The four days

Here is the week, day by day.

This is the low-step walk-in shower. Monday to Thursday, never Tuesday to Friday, because Friday is the buffer that protects your date.

Fri, before

Everything arrives

Materials on site, unwrapped

Floor protection and zip wall

Water shut-off found and tested

Monday

Demo and rough-in

Tub out, walls stripped

Plumbing and wiring roughed

Solid blocking for every grab bar

Tuesday

Floor and waterproofing

One-piece shower floor set in mortar

Wall membrane and backer board

Electrical and exhaust fan complete

Wednesday

Tile and set

Wall and floor tile

Toilet and vanity in

Valve trim on

Thursday

Finish and hand over

Glass panel, grab bars, bench

Grout, silicone, full clean

Walkthrough with you by 4pm

Curbless takes seven working days and a full accessible bathroom eight to ten, because the drain moves and the floor structure is opened and rebuilt. You are told which one your bathroom needs at the assessment, before you commit to anything.

Monday, walls open

This photograph is the whole argument.

Two-by-six blocking, continuous across three stud bays, roughly thirty-four inches from the floor. It goes in whether or not a grab bar is specified there today.

Retrofitting blocking later means opening a finished tiled wall. Putting it in on Monday costs almost nothing.

A bar screwed into a drywall anchor is decoration. It fails under a 190-pound person going down sideways, which is precisely the load it exists for.

If we get it wrong

Three guarantees with money behind them.

If this happensWhat we doLimit
Not finished by 4pm on the completion date in your contractWe pay $225 a night for hotel and meals until it is doneFive nights
Something fails on our workmanship within seven yearsWe come back and repair it at our costNo limit
We open a wall and find something we should have caught at the assessmentWe absorb it rather than charge youCase by case, in writing

The completion date is written into your contract before you sign. That is the whole point of charging for the assessment: measuring properly is what makes a date worth promising.

The question everybody asks

Where does she wash while the work is happening?

Four days is manageable. Most people have their parent stay with them Monday to Thursday, or the crew works around a downstairs powder room. Seven days usually is not, and ten certainly is not.

So if the house has one bathroom and nowhere else to wash, we will normally recommend the four-day low-step conversion even where a curbless entry would be technically better. A slightly less ideal shower she can live through beats a perfect one she can’t.

It is one of the first things checked at the assessment, and it changes the recommendation more often than anything else on the list.