The BCR Promise

The only basement company in Canada that puts its money on the line.

Most contractors make promises. We make guarantees. In writing. Before we start. Every single project.

Why this exists

We built The BCR Promise because this industry has a trust problem.

Every contractor in the GTA will tell you they do great work. Most of them believe it. But belief isn’t accountability, and accountability is exactly what’s been missing from this industry for decades.

Homeowners get vague quotes. Projects run over. Timelines slip. Finishes don’t match what was agreed. And when things go wrong, there’s no mechanism that protects you. Just excuses.

The BCR Promise is the mechanism. Three written guarantees, on price, on time, and on quality, that put real consequences behind our commitments. If we don’t deliver, it costs us. Not you.

No other GTA basement company offers all three. We checked.

“I’ve known I wanted to build since I was five years old. After 20 years in this industry, the thing that bothered me most wasn’t the bad contractors: it was the absence of any system that protected homeowners from them. So I built one.”

Quacy Barry, Founder & CEO, BCR Basements

Three guarantees. All in writing.

Click each guarantee to read the full terms.

Guarantee 01Fixed-Price GuaranteeThe price we quote is the price you pay. Period.

Most contractors give you a quote and then watch the number grow. Change orders, scope additions, “unforeseen issues”, these are the mechanisms that separate what you thought you’d pay from what you actually pay.

BCR doesn’t work that way. We start every project with a Feasibility Assessment: a paid, 90-minute strategy session where we walk your space, review your permit requirements, and understand the full scope of what needs to be built. That session is the foundation of your fixed-price quote.

“The only way we can guarantee a fixed price is if we’ve done the homework first. That’s why we charge for the Assessment. And why the number we give you is real.”

Delays are the single most common complaint in the renovation industry. Contractors start strong, then life gets in the way, another job, a supply issue, a trade who doesn’t show. And the homeowner just waits.

BCR builds a written timeline into every project contract. If we miss it, for any reason, we pay you $1,000 for every week we’re late. Not a credit. Not a discount on your next project. Cash, or deducted from your final payment.

“I’ve never seen another GTA basement company put money on a deadline. There’s a reason for that, most of them don’t plan well enough to commit. We do.”

The final walkthrough is your moment. We don’t shake hands and send an invoice and hope you notice defects later. We walk through every inch of the finished space together, and if there’s anything that doesn’t meet the agreed specification, you don’t pay the final amount until it’s corrected to your complete satisfaction.

And after you do pay, the work is backed by our 7-year warranty on all materials and workmanship. Not a 1-year statutory warranty. Seven years.

“We don’t shake hands on a basement we’d be embarrassed to put our name on. The final walkthrough isn’t a formality. It’s the standard.”

The difference it makes

With a written guarantee. Without one.

Most GTA homeowners only discover which kind of contractor they hired after something goes wrong. The BCR Promise removes that risk before the first nail is driven.

Without BCR

With BCR

The warranty

7 years. Every project.

7 Years

All materials and workmanship. 7-year warranty. No exceptions.

Ontario law requires a 1-year warranty on renovation work. BCR provides seven. That’s not a marketing number: it’s the standard we hold our trades and materials to on every project we build. If something fails within 7 years of completion, we come back and fix it.

WHAT OUR CLIENTS SAY

Homeowners Just Like You Love The BCR Promise

Common questions

About The BCR Promise

01. Is The BCR Promise actually in the contract?

Yes. Every guarantee, fixed price, on-time penalty, and defect-free completion is written into your project contract before any work begins. You receive a copy. It’s not a marketing promise. It’s a legal commitment.

Any day beyond the contracted completion date that is caused by BCR: including trades availability, material sourcing, or scheduling. Delays caused by permit authority timelines, homeowner-requested scope changes, or events outside BCR’s control are excluded and documented in the contract.

Your contract includes detailed specifications for all finishes, materials, and workmanship standards. A defect is anything that doesn’t meet those agreed specifications. We walk through the completed space together: if it’s not right, we fix it before you pay. There’s no ambiguity because the standard is written in advance.

The price cannot change due to anything within BCR’s control: material costs, labour, site conditions discovered during build. The only way the price changes is if you request additions or modifications to the agreed scope after signing. Those changes are documented and priced separately, with your approval, before any additional work begins.

Because The BCR Promise only works if the scope is fully understood before we quote. The Assessment is the homework: it’s what makes a fixed price possible. Without it, we’d be guessing, and a guess isn’t a guarantee. The $697 comes off your project invoice in full if you move forward with BCR.

Ready to build with a company that puts its money on the line?

The BCR Promise starts with the Feasibility Assessment. It’s where we earn the right to make these guarantees.

If your Feasibility Assessment doesn’t give you more clarity than any free estimate you’ve received, we’ll refund it. No questions.