Wet bar

A bar that looks like it was always part of the house

Most basement bars look like basement bars. The ones that do not come down to three things: real millwork instead of stock cabinets, plumbing planned before framing rather than routed around it, and lighting designed for the bar rather than borrowed from the room.

4.7★ Google  ·  700+ GTA projects  ·  Fixed price, on time, defect-free

Typical starting investment

$40K

For a full wet bar with millwork and plumbing

Typical investment$40,000 to $75,000
Typical size80 to 200 sq ft of bar area
Timeline8 to 12 weeks
IncludesMillwork, plumbing, lighting
Could my basement do this?Six questions · under two minutes · free→

What BCR handles

What separates this from a finished room with the right furniture in it.

Most of it is invisible once the drywall is up. That is exactly why it gets skipped, and why it is the difference you feel every day afterwards.

Custom millwork

Built for the space rather than assembled from stock units. That is what stops it looking like a kitchen that ended up in the wrong room.

Plumbing planned first

A bar sink needs supply, drainage and venting, and where those can go depends on your existing stack. Deciding the bar location before checking the plumbing is how people end up with a bar on the wrong wall.

Wine and bottle storage

Racking, cooled storage if you want it, and glass storage that is actually reachable. Designed around what you drink rather than a generic layout.

Lighting that does the work

Under-cabinet, in-cabinet and a feature above the bar itself. A bar lit only by the room lighting always looks unfinished.

Surfaces that survive

Stone or quartz counters, a proper backsplash and finishes that tolerate spills and moisture. A bar takes more abuse than most kitchen counters.

Integration with the room

A bar is rarely the whole project. We design it as part of the lounge or theatre it sits in, so sightlines and traffic flow work when people are actually using it.

How a wet bar comes together

Same process. Every project. No exceptions.

01

Feasibility Assessment

A 90-minute session at your home. We measure, check the permit path and give you a real investment range for your actual basement. $697, credited in full if you build with BCR.

02

Fixed-Price Strategy

Full scope, fixed price and timeline in writing. You sign when you are 100% confident, not before. The number does not change after this point.

03

We Build

BCR manages every permit, trade and inspection. Regular updates throughout, and a full walkthrough at completion.

04

Warranty

Seven years on materials and workmanship. You do not pay the final amount until the work is right.

The BCR Promise

Three guarantees, all with money behind them.

Fixed-Price Guarantee

The price we quote is the price you pay. We assess before we quote, so the number is real.

On-Time Guarantee

One week late? We pay you $1,000. Every week. Written in your contract before we start.

Defect-Free Guarantee

You do not pay the final amount until the work is perfect. Backed by our 7-year warranty.

Common questions

Answered honestly, including when the answer is no.

How much does a basement wet bar cost?

$40,000 to $75,000 for a full wet bar with custom millwork, stone counters, plumbing and integrated lighting. A dry bar with no sink and no plumbing runs considerably less, typically $18,000 to $30,000.

A wet bar has a sink and running water, which means supply, drainage and venting. A dry bar is cabinetry, counter and storage with no plumbing. The plumbing is most of the cost difference and most of the complexity.

Not quite. It needs to be within practical reach of the existing drainage stack, or you are looking at a pump system and additional cost. That constraint is worth knowing before you decide on a layout.

If you are adding plumbing, yes. A plumbing permit is required and the work has to be inspected. If it is a dry bar with no water, generally the permit follows the wider basement finishing work rather than the bar itself.

Less than a legal suite and more than most people expect. It is a feature buyers remember, but it is not a project to build purely for resale value. Build it because you will use it.

Also from BCR

Six types of basement. One question: what do you want yours to do?

In-Law & Multi-Gen Suites

See what is involved →

Home Theatres & Entertainment

See what is involved →

Home Offices & Studios

See what is involved →

Find out what your basement could become.

Ninety minutes on site tells you where the bar can go, what the plumbing will take, and what it will cost.

Google 4.7★ · 700+ Projects · 7-Year Warranty · $1,000/week On-Time Guarantee